Sazeh Pardazan LogoSazeh Pardazan Logo
  • HOME
  • ABOUT US
  • PROJECTS
  • CAREERS
  • FACILITY
    • BAND SCREEN
    • BAR SCREEN
    • BOILER
    • CHOLORINATION PACKAGE
    • MATERIAL HANDLING
    • PENSTOCK
    • PIPELINE
    • PIPING
    • SHIP LOADER
    • STRUCTURE
    • TRASH RACKING MACHINE
    • VESSEL
  • DOWNLOAD
  • CONTACT US
Logo-Sazeh-1
Logo-Sazeh-1

Penstock

September 10, 2018نام کاربر
  • Project Name: South Pars Gas Field Development - Phases 22-24
    Contract Number: PSA-SP-PC-PAY-89-105
    Main Contractor: Sazeh Pardazan
    Client: Petro Sina Aria Co.
    Duration Month(s): 6
    Start Date: May 2012
    Completion Date: November 2013
    Location: Assaluyeh
    South Pars Gas Field Development Phase 22-24
    Project Name: Shirindareh Dam
    Contract Number: 901710
    Main Contractor: Sazeh Pardazan
    Client: Khorasan Water Auth. Co.
    Duration Month(s): 12
    Start Date: August 2009
    Completion Date: August 2010
    Location: Golestan Provence
    Shirindareh Dam
    Project Name: Tehran Water Treatment
    Contract Number: 12-848
    Main Contractor: Sazeh Pardazan
    Client:
    Duration Month(s): 12
    Start Date: August 2012
    Completion Date: August 2013
    Location: Assaluyeh
    Tehran Water Treatment
    Project Name: Shirindareh Dam Spillway
    Contract Number: 901710
    Main Contractor: Sazeh Pardazan
    Client: Khorasan Water Auth. Co.
    Duration Month(s): 12
    Start Date: August 2009
    Completion Date: August 2010
    Location: Golestan Provence
    Shirindareh Dam Spillway
    Shirin Dare Dam Sazeh Pardazan

Stop log is an on/off valve which is used for rectangle channel .for decreasing of lifting force, by pass valve would be used.
The stop logs are designed to isolate the whole basin Or the part of channels. This equipment are made welded construction which Fabricated from Steel Plate and rolled Steel section. Sealing would be secured by Flexible neoprene Seal around the stop log. Seal shape would be designed accordance with project specification.

Shirin Dareh Dam Penstock

Shirin Dareh Dam Penstock Project

October 13, 2018نام کاربر
kermanshah petrochemical plant sluice gate

Kermanshah Petrochemical Plant Sluice Gate

October 13, 2018نام کاربر
Tehran Water Treatment Sluice Gate Project - Sazeh Pardazan Co.

Tehran Water Treatment Sluice Gate Project

October 13, 2018نام کاربر
South Pars Gas Field Development Phase 15 -16 Stop Log Project

South Pars Gas Field Development Phase 15 -16 Stop Log Project

October 13, 2018نام کاربر
Phase-22-24-Penstock

South Pars Gas Field Development Phase 22 -24 Penstock Project

October 5, 2018نام کاربر
Kish Stop log Project

Kish Gas Field Development Penstock Project

October 5, 2018نام کاربر

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

About Sazeh Pardazan Co.

Sazeh Pardazan began operating as a main contractor of Water projects in 1992 and after simultaneous Installation of a few big Water projects during year of 2002 & 2003, has expanded its operating in other related filed’s of water & Energy. Now, Sazeh Pardazan with cooperation of other local & foreign companies, in addition to performance of water projects, has been entered as a turn-key in the filed’s of performance of Independent and Power (Gas & combined cycle power plant) and oil, Gas and petrochemical projects.

Links

  • Ariyan Tadbir CO.
  • The Institute of standards and Industrial research of Iran ( ISIRI) (ISO 9001-2000)
  • Organizational Excellence Award
  • European Foundation for Quality Management (EFQM)

Contact Sazeh Pardazan Co.

No.289, Jalal-e-Aleahmad Ave., Tehran, Iran.

info@sazeh-pardazan.com

+9821-44220400-500

+9821-44226030

HomepageAbout UsProjectsFacility
© 2024 Sazeh Pardazan Company. All Rights Reserved / Web Design & Seo by PEPRO